Sizewell C - Ecology Grounds Maintenance ​and Enabling Works

Posted: 7 May 2026
Reading Time: 3 minutes

  • P1006711.jpg

Freedom supports the construction side of the Sizewell C project with site clearances, tree works, hedgerow removals and the sensitive management of any ecological constraints to enable the civil side of the project.​

We are the sole provider of all ecological pre-commencement checks, Ecological Clerk of Works (ECoW) species management surveys and licensable mitigation work, in line with the DCO and any Natural England requirements.

Ecological supervision and mitigation​

  • Daily ecological briefings and supervision across all construction phases and locations,supporting Tier 1 contractors​

  • Bat roost inspections and implementation of exclusion techniques where required​

  • Badger mitigation including monitoring, sett closures, installation and ongoing maintenance of artificial setts​

  • Water vole trapping, translocation and licensed habitat destruction, delivered under Natural England licence​.

Enabling works vegetation clearance

  • Site surveys and risk assessments, identifying hazards, tree condition, stability, access and felling methods​

  • Use of specialist equipment including excavators with shear or grab attachments, tracked dumpers,bush cutters, chippers, winches and cranes​

  • Application of appropriate felling techniques including straight felling, controlled directional felling and sectional dismantling by arborists​

  • Post‑felling activities including stump treatment, ground reinstatement, replanting of target species and production of clearance reports.