Welcome to our new website. Why not take a look around?

Nuclear

Hinkley Point C-04
Nuclear generic

Delivering certainty

Operating to exacting nuclear licensing standards, our teams deliver precision-engineered solutions across electrical, controls and instrumentation systems, power infrastructure and specialist lighting design. By combining deep technical expertise with advanced digital tools such as BIM and offsite manufacturing, we ensure quality assurance, programme certainty and optimised whole-life performance. 

Our ‘right first time’ approach underpins everything we do, maintaining the highest standards of safety, quality and compliance in environments where there is no margin for error. 

Nuclear

Expertise built on trust and technical excellence

Our nuclear heritage dates back to the 1950s, when we were involved in the creation of Calder Hall, the world’s first full-scale nuclear power station. 

Since then, we have played a continuous role in the development and maintenance of the UK’s nuclear infrastructure, from early generation facilities through to modern, highly complex sites such as Hinkley Point C, Sizewell B, Sellafield and Urenco.   

This long-standing presence reflects our reputation for precision engineering, safety and reliability, built through decades of trusted relationships and consistent delivery. 

Supporting the UK's nuclear infrastructure

We operate across civil and defence nuclear environments, supporting critical national infrastructure at licensed sites throughout the UK. From clean energy generation and defence programmes to complex decommissioning projects, our teams work in highly regulated, operational environments, maintaining and enhancing infrastructure while ensuring safety, security and continuity.

Hinkley Point C

Hinkley Point C is the UK’s first new nuclear power station in a generation. Since 2016, we have been  supporting the electrical package as part of a joint venture.  This nationally significant infrastructure project, delivering high‑quality building services and engineering solutions will create a low‑carbon energy source designed to power millions of homes for decades to come, whilst creating up to 1,000 jobs and delivering a lasting local legacy through apprenticeships and skills development.

Sizewell C

Since 2023, we have delivered all ecology, arboriculture, enabling, landscaping, and grounds maintenance services for the Sizewell C infrastructure project. Our remit spans multiple linear schemes, including two new link roads, a new rail connection, and several interconnected construction zones across the Eastern Suffolk region.

Sellafield

Located in West Cumbria, Sellafield has been central to the UK’s nuclear programme since the 1940s. We have supported operations from 1976 to 1997 and continue to work on site today, delivering electrical and instrumentation solutions, lighting, high‑ and low‑voltage power services, and long‑term engineering support across this nationally critical facility. 

Hinkley Point C

Our nuclear journey


  • Caldwell Hall Nuclear

    1953

    Calder Hall

    In 1956, Her Majesty The Queen opened the world’s first full‑scale nuclear power station at Calder Hall in Cumbria. As the principal electrical contractor, we installed the individual division boards and electrical contractors that powered the plant. Calder Hall also began supplying electricity to the national grid, marking a landmark moment in UK energy history and establishing NG Bailey’s specialist nuclear capability.

    1953
  • Hinkley point c (2)

    1970

    Hinkley Point A

    Hinkley Point A, a Magnox nuclear power station located on the Somerset coast, was operational from 1965 to 1976. We were responsible for delivering key electrical services, including power cabling and instrumentation cabling, supporting the safe and reliable operation of the station.

    1970
  • Heysham

    1970

    Heysham Stage One

    Heysham Power Station is a nuclear facility on the Lancashire coast. Commissioned in the 1980s, We supported the development of Heysham Stage One, delivering electrical services across both advanced gas‑cooled reactors, reinforcing our expertise in complex nuclear environments.

    1970
  • Sellafield

    1976–1997 and present

    Sellafield

    Located in West Cumbria, Sellafield has been central to the UK’s nuclear programme since the 1940s. We supported operations from 1976 to 1997 and continues to work on site today, delivering electrical and instrumentation solutions, lighting, high‑ and low‑voltage power services, and long‑term engineering support across this nationally critical facility.

    1976–1997 and present
  • Sizewell C generic

    1986

    Sizewell B

    Operated by EDF, Sizewell B is the UK’s only pressurised water reactor. We have delivered electrical services supporting both nuclear and conventional plant operations, including power distribution, cabling, earthing and lightning protection, contributing to the station’s safe and efficient performance.

    1986
  • advance man

    1996–present

    Urenco

    Based in Capenhurst near Chester, Urenco produces enriched uranium to support nuclear power generation worldwide. We have built a long‑standing relationship at the site, delivering specialist electrical and mechanical services within a highly regulated and secure environment.

    1996–present
  • Hinkley point c (1)

    2016–present

    Hinkley Point C

    Hinkley Point C is the UK’s first new nuclear power station in a generation. Since 2016, we have been supporting the £460million electrical package as part of a joint venture with Balfour Beatty. This nationally significant infrastructure project, delivering high‑quality building services and engineering solutions will create a low‑carbon energy source designed to power millions of homes for decades to come, whilst creating up to 1,000 jobs and delivering a lasting local legacy through apprenticeships and skills development.

    2016–present
North Tees Hosp Energy Centre-04

Build your career with us

We are always looking for talented people to join our team. From early-stage design through to complex construction, maintenance and decommissioning, our projects offer the opportunity to work in some of the most technically challenging and highly regulated environments in the country. 

If you’re looking to build a long-term career and want to be part of a team delivering critical energy infrastructure, we’d like to hear from you.